Insights: Track Same Stage Across Multiple Pipelines

Currently, each time a new Pipeline is created, the stages entered are all recognized as new stages, even if the same stages have been used in previous Pipelines. This means that when you make a report in Insights to look up the same stage across your Pipelines, the stages are not grouped, and the reporting is inaccurate.

For example, if you use the same stage on 10 different Pipelines, that same stage shows up 10 different times on the same Insights report. Not able to put them together, and needing to create multiple reports of each separate pipeline to get the information necessary.

Being able to get a holistic view of multiple projects in various stages from multiple pipelines on top of each other would be a great benefit. Please make it so that the same exact stage can be used across all Pipelines to make Insights more accurate and Pipelines can be compared/reviewed at a mass.

1
1 votes

Submitted · Last Updated