Projects task custom fields
![JamesAtTCA](https://us.v-cdn.net/6037014/uploads/userpics/I23RIS4CZN1C/nZBZ2DNK6RZWI.png)
JamesAtTCA
Member Posts: 6 VERIFIED MEMBER
![5 Up Votes](https://us.v-cdn.net/6037014/uploads/badges/T5KOU269BZVN.png)
![Photogenic](https://us.v-cdn.net/6037014/uploads/badges/DWAP3NZPOC7U.png)
![Name Dropper](https://us.v-cdn.net/6037014/uploads/badges/KUKSS67XBZ6D.png)
![First Comment](https://us.v-cdn.net/6037014/uploads/badges/DF5XRP8OLBHB.png)
The project tasks really need custom fields to be more valuable. As an example I often work with contacts outside my own firm and would assign tasks to them. Even if it is not a full blown PM system with the intent to have outside users interact with it, I still need to assign tasks to external users. A "People" field would be great. Other fields like start date and duration would be valuable especially if they could be calculated and you could adjust either start/end or duration.
Tagged:
3