How to custom re order individual Deals within each stage.

Tim O'Shea
Tim O'Shea Member Posts: 2 VERIFIED MEMBER
edited July 2022 in Business Talk #1

Hi Guys,  We use several different pipelines to track roofing projects over the course of their project lifespan. I would really like to be able rearrange each individual Deal  in each Stage to represent the order in which we will address  them.  Can this be done?

Tagged:

Comments

  • Bert Calatz
    Bert Calatz Member Posts: 59 VERIFIED MEMBER
    10 Comments
    edited February 2022 #2

    @Tim O'Shea  In list mode and based on the next activity this is possible yes. But am I wrong if I think this is not quite what you want?

  • Tim O'Shea
    Tim O'Shea Member Posts: 2 VERIFIED MEMBER
    edited January 2021 #3

    @Tim O'Shea  In list mode and based on the next activity this is possible yes. But am I wrong if I think this is not quite what you want?

    Thanks Bert Calatz. I need to re arrange the leads n Pipeline Mode.

  • Bert Calatz
    Bert Calatz Member Posts: 59 VERIFIED MEMBER
    10 Comments
    edited January 2021 #4

    @Tim O'Shea  In list mode and based on the next activity this is possible yes. But am I wrong if I think this is not quite what you want?

    I thought so. And as far as I know that is not possible.

  • Mike van der Valk
    Mike van der Valk Pipedrive Team Posts: 3,064 PIPEDRIVE TEAM
    2500 Comments Fourth Anniversary 100 Likes 5 Answers
    edited July 2022 #5

    Hi @Tim O'Shea 

    Unfortunately @Bert Calatz is right. The Pipeline is ordered based on activities linked to the deal. You can indeed order them in the list.

This discussion has been closed.