How to custom re order individual Deals within each stage.

Options
Tim O'Shea
Tim O'Shea Member Posts: 2
edited July 2022 in Business Talk #1

Hi Guys,  We use several different pipelines to track roofing projects over the course of their project lifespan. I would really like to be able rearrange each individual Deal  in each Stage to represent the order in which we will address  them.  Can this be done?

Tagged:

Comments

  • Bert Calatz
    Bert Calatz Member Posts: 60
    First Comment
    edited February 2022 #2
    Options

    @Tim O'Shea  In list mode and based on the next activity this is possible yes. But am I wrong if I think this is not quite what you want?

  • Tim O'Shea
    Tim O'Shea Member Posts: 2
    edited January 2021 #3
    Options

    @Tim O'Shea  In list mode and based on the next activity this is possible yes. But am I wrong if I think this is not quite what you want?

    Thanks Bert Calatz. I need to re arrange the leads n Pipeline Mode.

  • Bert Calatz
    Bert Calatz Member Posts: 60
    First Comment
    edited January 2021 #4
    Options

    @Tim O'Shea  In list mode and based on the next activity this is possible yes. But am I wrong if I think this is not quite what you want?

    I thought so. And as far as I know that is not possible.

  • Mike van der Valk
    Mike van der Valk Pipedrive Team Posts: 3,077 PIPEDRIVE TEAM
    First Anniversary 5 Likes 5 LOLs First Answer
    edited July 2022 #5
    Options

    Hi @Tim O'Shea 

    Unfortunately @Bert Calatz is right. The Pipeline is ordered based on activities linked to the deal. You can indeed order them in the list.